This was a day that some riders looked forward to, and others dreaded. It was going to be a big climb up Danseys Pass, then a big descent to Naseby, where we would connect up with the Central Otago Rail Trail.
As we expected it was up and up and up!!! This is a quiet unsealed gravel road, with farmland gradually making way to more alpine tussock as we climbed. For Anna and myself, it was the most fun ride so far.
When we reached the top, we could see had a picnic lunch amongst the tussock, with not a bad view!
The trail then descended, with another short climb before dropping down to Naseby. The total climb for the day was ~1300m, so the legs had good workout.